Volume Summary
Total LBC 0 m³
Total UBC 0 m³
Grand Total 0 m³
Steps for Usage:
- Input Project Information: Enter the project name and type.
- Input Dimensions: Enter the length, width, LBC and UBC thickness.
- Select Preset: Use a composition preset or input manually.
- Adjust Composition: Ensure the total percentage equals 100%.
- Input Prices: Adjust material prices according to your region.
- Calculate: Click the calculate button to see the results.
- Export: Download the PDF report if needed.
Material Descriptions:
- LBC: Lower Base Course. The foundation layer directly above the subgrade.
- UBC: Upper Base Course. The layer on top of the LBC, below the surface layer.
- Sand and Gravel: A mixture of sand and small pebbles.
- Stone 2/3: Crushed stone, size 2/3 inch.
- Stone 3/5: Crushed stone, size 3/5 inch.
- Stone 1/2: Crushed stone, size 1/2 inch.
- Stone Dust: Fine particles from the stone crushing process.